WebQuest
Canyon Extraction Robot
Process
Process
-
Students will form form groups of 8
-
Each group will break up into 4 teams. Choose the team with which you choose to participate during the project: engineering, sales and marketing (business), or animation.
-
Each Team will choose a team leader to report to project manager.
-
The entire group will discuss the task and brainstorm their account on their blog.
-
Submit final design to the Project Manager and post on your blog.
-
The Business Team (sales and marketing) will submit a budget to the project manager based upon cost analysis of parts and brainstorming session with group.
-
The Project Manager will submit cost analysis to instructor via the blog.
-
The Engineering Team will refine design chosen during brainstorming.
-
The Engineering Team will re-submit design to Business Team and get an "okay" on design cost.
-
The Engineering Team will submit the final design to both Business and Animation Teams with technical specifications for design.
-
The Animation Team will confirm design and begin technical drawings; confirm cost of drawings with Business Team.
-
The Animation Team will submit hand drawings (in digital format) of design prior to virtual mock-up to Project Manager for posting to the blog.
-
The Team leaders will report to Project Manager bi-weekly through blog.
-
The Project Manager will report to instructor in person at least bi-weekly, more if necessary to remedy conflicts.
-
The Engineering team will begin building
-
The Business Team will maintain the cost of design and animation, as well as formulating a design for sales and marketing of the final product.
-
The Business Team will begin designing the presentation of project through PowerPoint, Glogster or other multimedia presentation.
-
The Animation team will confirm the technical specifications with Engineering Team to assure continuity of design over the past several days.
-
The Project Manager will maintain order within groups and encourage staying on schedule while encouraging the great effort of the group members.
-
The Project Manager must check-up on progress of individual members� blogs.
-
The Engineering team, begin testing design by 5th week of assignment
-
The Engineering team will begin programming robot for full autonomy by 6th week. Programming code must be posted to the blog by the Project Manager
-
The Business team will need to finalize the cost of total design and building of the product and estimate a market cost for the product.
-
The Project Manager will discuss, in person, market and cost of design with the teacher.
-
The Animation Team will finalize the drawing and submit to both Business and Engineering team leaders blogs for any additions.
-
Re-submit after making corrections.
-
All teams come together for final testing of product and photo-shoot with product by 11th week.
-
Make any additional changes as needed.
-
The Project Manager will submit entire design, robot, programming, animation, and sales and marketing data, as well as presentation intended to lure customers by the 13th week.
-
Final testing and presentation of design in front of Mrs. Herbig, faculty, and administration.
-
NOTE: ALL TEAMS AND INDIVIDUALS BE SURE TO MAINTAIN GROUP BLOGS AND INDIVIDUAL ACCOUNTABILITY THROUGH PERSONAL BLOGS ON EDUBLOGS.
The Public URL for this WebQuest:
http://zunal.com/webquest.php?w=68385
WebQuest Hits: 3,111
Save WebQuest as PDF